The Corps is installing a sixth generating unit at Libby Dam so it can maintain a unit while retaining five-unit capacity. Its October 13, 2026 update says the powerhouse is closed to the public during the installation.

Why install another unit now?
The original powerhouse was designed with room for up to eight generators. The first produced commercial power in August 1975. The Corps’ October 2026 account says the fifth was added in 1984 and describes a $34.8 million contract for the sixth, awarded on May 29, 2024.
Major repairs and upgrades can keep an existing generator out of service for an extended period. Having another generator available is intended to improve reliability during maintenance, while operators still account for water availability, releases and river conditions. The Corps also says it is upgrading the system that selects the depth of water released through the powerhouse.
How to check public access
The October announcement gives April 2027 as a target for the installation and says the Corps anticipates resuming public access afterward. Ask the Visitor Center at 406-293-5577 to confirm specific tour options before making a trip. Construction completion and the date a public tour resumes are separate details to confirm.