Dam & hydropower

How Libby Dam holds back the Kootenai

Understand Libby Dam’s concrete gravity design and what the spillway, sluices, stilling basin and powerhouse each do.

Libby Dam is a concrete gravity dam. Its massive section transfers the forces from the reservoir to bedrock. The powerhouse, spillway and sluices provide different paths for releases into the Kootenai River.

The weight of the structure

The Corps describes a straight-axis structure rising 422 feet and stretching 3,055 feet. It was built in large concrete sections called monoliths. Its weight and bedrock foundation resist the pressure from the water behind it. The reservoir or upstream side is the forebay, while the receiving river just below is the tailwater.

Where released water goes

Inside the powerhouse, water passes through turbines to generate electricity. The spillway routes water through gated openings above its crest. The sluices provide a separate gated path from lower in the dam. A stilling basin dissipates energy from outlet releases before they reach the river channel.

The Corps’ Water Control Manual includes section drawings that show how these parts fit together. They explain how the dam can store and release water for several purposes, including hydropower, flood-risk management and conditions for fish downstream.

Sources